zevOS

01Glossary

Every term in EV charging, defined properly

53 terms across protocols, hardware, electrical, commercial and operations — each with the practical consequence stated, not just the definition.

ProtocolsHardwareElectricalCommercialOperationsStandards

C

9 terms

CCS2

Hardware

Combined Charging System, Type 2

The dominant DC fast-charging connector standard for cars in India and Europe. It extends the Type 2 AC connector with two additional DC pins.

CDR

Commercial

Charge Detail Record

The billable record of a completed charging session, exchanged between platforms in roaming. It carries the energy, duration, tariff and cost.

CHAdeMO

Hardware

A DC fast-charging standard developed in Japan. Its installed base in India is small and shrinking.

Charge point

Hardware

The physical unit installed at a site, identified to the platform by a unique OCPP identity. It contains one or more EVSEs, each with one or more connectors.

Charging profile

Operations

An OCPP construct that instructs a charger to limit its output according to a schedule, expressed in amps or watts. A TxDefaultProfile applies to all sessions; a TxProfile applies to one.

Charging taper

Operations

The reduction in charging power as a battery approaches full, controlled by the vehicle to protect cell life. It is why average session power is well below the charger’s rating.

Connector

Hardware

The physical plug a driver inserts into the vehicle. A single EVSE may expose several connector types — for example a CCS2 gun and a CHAdeMO gun — of which only one can typically be used at a time.

CPO

Commercial

Charge Point Operator

The business that operates charging hardware — installing, maintaining and selling charging sessions from it, usually on land owned by someone else.

CSMS

Operations

Charging Station Management System

The platform that manages charging infrastructure: connecting chargers over OCPP, handling sessions, pricing, payments, drivers, partners and reporting.

Missing something?

If you hit a term in a tender document, a DisCom order or a vendor datasheet that is not here, tell us and we will add it. That is how most of this list got written.

Know the words, now see the system

A walkthrough against your own chargers, tariffs and partner structure.