zevOS

01Ebook

The Fleet Electrification Handbook

Depot charging, duty cycles and cost per kilometre

18 pagesPDF, with the sizing worked throughUpdated 15 May 2026

What you get

Takeaways

  • How to size a depot connection against duty cycles rather than nameplate charger capacity
  • The load-management arithmetic that avoids a sanction upgrade
  • Attributing energy cost per vehicle and per route
  • Handling opportunity charging on public networks under one account

Contents

  1. 01

    Starting from the duty cycle

    Working backwards from route energy and departure schedules to charging requirements, rather than forwards from charger specifications.

  2. 02

    Sizing the connection

    Why depots are the worst case for diversity, and what load management is worth in demand charges avoided.

  3. 03

    Authorisation without payment

    RFID, driver and vehicle groups, local authorisation lists, and why a depot must keep charging when the network does not.

  4. 04

    Cost per kilometre

    Attributing session energy to vehicles and routes, and joining it to telematics data.

  5. 05

    Charging away from the depot

    Opportunity charging on public networks, roaming, and keeping it on one invoice.

Or skip the reading

We are happy to work through your own numbers directly — that is usually faster than a document.